PHP Deprecated

Message

unserialize(): Passing null to parameter #1 ($data) of type string is deprecated

Error at

app/addons/hybrid_auth/func.php, line: 200

Backtrace

File:app/addons/hybrid_auth/func.php
Line:200
Function:{closure}
File:app/Tygh/Registry.php
Line:800
Function:{closure}
File:app/addons/hybrid_auth/func.php
Line:222
Function:getOrSetCache
File:app/addons/hybrid_auth/controllers/frontend/init.post.php
Line:17
Function:fn_hybrid_auth_get_providers_list
File:app/functions/fn.control.php
Line:727
Function:include
File:app/functions/fn.control.php
Line:458
Function:fn_run_controller
File:index.php
Line:19
Function:fn_dispatch
1500mm Square Shower Bath LH

L-Shape Square Shower Bath Left Hand 1500mm - No Leg Set

WBS103
Stock due in: 17/06/2026
£400.83
On backorder

Minimum quantity for "L-Shape Square Shower Bath Left Hand 1500mm - No Leg Set" is 1.

Please sign in to buy

This product cannot be added to the
cart because you are not logged in.

Add to wish list Add to comparison list

Description

nuie Shower Baths L-Shape Square Shower Bath Left Hand 1500mm - No Leg Set
L-Shape Square Shower Bath Left Hand 1500mm - No Leg Set
£400.83
Please sign in to buy

This product cannot be added to the
cart because you are not logged in.

Add to comparison list

Features & Benefits

nuie Shower Baths L-Shape Square Shower Bath Left Hand 1500mm - No Leg Set

Details

Displaced Capacity (L)
130 Litre

Downloads

Server

Request

Config

SQL

Cache queries

Logging

Templates

Blocks