1700mm Left Hand Square Shower Bath

WBS1785L
£444.17
On backorder

Minimum quantity for "1700mm Left Hand Square Shower Bath" is 1.

Please sign in to buy

This product cannot be added to the
cart because you are not logged in.

Add to wish list Add to comparison list

Description

nuie Shower Baths 1700mm Left Hand Square Shower Bath
1700mm Left Hand Square Shower Bath
£444.17
Please sign in to buy

This product cannot be added to the
cart because you are not logged in.

Add to comparison list

Features & Benefits

Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option. Designed and built to the highest quality. Sanitary Grade Acrylic. Un-drilled. Supplied with leg set. Bath panels sold separately.

Details

Displaced Capacity (L)
165 Litre

Downloads

Complete The Look

You May Also Like

Server

Request

Config

SQL

Cache queries

Logging

Templates

Blocks