PHP Deprecated

Message

unserialize(): Passing null to parameter #1 ($data) of type string is deprecated

Error at

app/addons/hybrid_auth/func.php, line: 200

Backtrace

File:app/addons/hybrid_auth/func.php
Line:200
Function:{closure}
File:app/Tygh/Registry.php
Line:800
Function:{closure}
File:app/addons/hybrid_auth/func.php
Line:222
Function:getOrSetCache
File:app/addons/hybrid_auth/controllers/frontend/init.post.php
Line:17
Function:fn_hybrid_auth_get_providers_list
File:app/functions/fn.control.php
Line:727
Function:include
File:app/functions/fn.control.php
Line:458
Function:fn_run_controller
File:index.php
Line:19
Function:fn_dispatch
1700 Sq Bath Panel & Chrome Screen LH

1700 Square Bath Panel & Chrome Screen - Left Hand

BAZSS003
£822.49
On backorder

Minimum quantity for "1700 Square Bath Panel & Chrome Screen - Left Hand" is 1.

Please sign in to buy

This product cannot be added to the
cart because you are not logged in.

Add to wish list Add to comparison list

Description

Nuie 1700 Square Bath Panel & Chrome Screen - Left Hand
1700 Square Bath Panel & Chrome Screen - Left Hand
£822.49
Please sign in to buy

This product cannot be added to the
cart because you are not logged in.

Add to comparison list

Features & Benefits

  • Includes 1700mm left hand shower bath, bath screen & gloss white acrylic side panel
  • End panel not included
  • Designed and built to the highest quality
  • Sanitary Grade Acrylic
  • Un-drilled
  • Supplied with leg set

Details

Displaced Capacity (L)
165 Litre

Downloads

Server

Request

Config

SQL

Cache queries

Logging

Templates

Blocks