1700 Square Bath Panel & B/Brass Screen - Left Hand

BAZSS021
£744.99
On backorder

Minimum quantity for "1700 Square Bath Panel & B/Brass Screen - Left Hand" is 1.

Please sign in to buy

This product cannot be added to the
cart because you are not logged in.

Add to wish list Add to comparison list

Description

Nuie 1700 Square Bath Panel & B/Brass Screen - Left Hand
1700 Square Bath Panel & B/Brass Screen - Left Hand
£744.99
Please sign in to buy

This product cannot be added to the
cart because you are not logged in.

Add to comparison list

Features & Benefits

  • Includes 1700mm left hand shower bath, bath screen & gloss white acrylic side panel
  • End panel not included
  • Designed and built to the highest quality
  • Sanitary Grade Acrylic
  • Un-drilled
  • Supplied with leg set

Details

Displaced Capacity (L)
165 Litre

Downloads

Server

Request

Config

SQL

Cache queries

Logging

Templates

Blocks