PHP Deprecated

Message

unserialize(): Passing null to parameter #1 ($data) of type string is deprecated

Error at

app/addons/hybrid_auth/func.php, line: 200

Backtrace

File:app/addons/hybrid_auth/func.php
Line:200
Function:{closure}
File:app/Tygh/Registry.php
Line:800
Function:{closure}
File:app/addons/hybrid_auth/func.php
Line:222
Function:getOrSetCache
File:app/addons/hybrid_auth/controllers/frontend/init.post.php
Line:17
Function:fn_hybrid_auth_get_providers_list
File:app/functions/fn.control.php
Line:727
Function:include
File:app/functions/fn.control.php
Line:458
Function:fn_run_controller
File:index.php
Line:19
Function:fn_dispatch
Square Shower Bath L/H 1600x850

1600mm Left Hand Square Shower Bath

WBS1685L
£444.17
On backorder

Minimum quantity for "1600mm Left Hand Square Shower Bath" is 1.

Please sign in to buy

This product cannot be added to the
cart because you are not logged in.

Add to wish list Add to comparison list

Description

nuie Shower Baths 1600mm Left Hand Square Shower Bath
1600mm Left Hand Square Shower Bath
£444.17
Please sign in to buy

This product cannot be added to the
cart because you are not logged in.

Add to comparison list

Features & Benefits

Suitable for use with a bath screen to create a shower enclosure, a perfect space saving option. Designed and built to the highest quality. Sanitary Grade Acrylic. Un-drilled. Supplied with leg set. Bath panels sold separately.

Details

Displaced Capacity (L)
130 Litre

Downloads

Complete The Look

You May Also Like

Server

Request

Config

SQL

Cache queries

Logging

Templates

Blocks